Close

Recent Posts

Archives

TxDOT Road Report for 12/17

TxDOT Road Report for 12/17
  • PublishedDecember 17, 2021


Interstate 30 in Sulphur Springs/ Courtesy SSHC EDC

[adning id=”33097″]

SH 37, Franklin County: from the elementary school to US 67. Watch for lane closures and short traffic delays as crews install sidewalk.

IH 30, Hopkins County: from Hunt County Line to Franklin County Line. Watch for lane closures and short traffic delays as crews perform concrete repair.

Maintenance crews in Rains County will be performing seal coat prep work on SH 34 from SH 276 to the Kaufman County line. Crews will be performing various sign installations, potholing, edging, and debris removal. Maintenance crews will be performing herbicide operations on various roadways. Please watch for lane closures, work zones and workers along the roadway, and maintain a safe distance from work crews.

Contributed by Tim McAlavy

[adning id=”33207″]

Written By
Taylor Nye

Taylor Nye is the editor of Front Porch News. She has degrees from the University of Wisconsin in human biology, Latin American studies, and public health. She has previously worked at the Wisconsin State Journal, Tucson Weekly and Sulphur Springs News-Telegram. As a sixth generation Hopkins County resident, she loves celebrating our heritage and history.