Close

Recent Posts

Archives

TxDOT Road Report for 7/4

TxDOT Road Report for 7/4
  • PublishedJuly 5, 2022


Interstate 30 in Sulphur Springs/ Courtesy SSHC EDC

[adning id=”33097″]

Paris District Road Report for July 4, 2022

Here’s a look at work planned in the district for the week starting July 4, 2022. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sulphur Springs Area (Hopkins, Franklin, Delta Counties):

IH 30, Hopkins County: from Loop 301 to Franklin County Line. Watch for lane closures and traffic delays as crews begin surfacing operations.

FM 1536, Hopkins County: from SH 19 to FM 71. Watch for lane closures and short delays as crews rehabilitate the roadway.

FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

CR 3440, Delta County: at Jennings Creek. Watch for road closure while crews replace the existing bridge.

CR 15100, Lamar County: at a Branch of Cuthand Creek. Be aware that the road is closed while crews replace the existing bridge.

Contributed by Tim McAlavy

[adning id=”33207″]



Written By
Taylor Nye

Taylor Nye is the editor of Front Porch News. She has degrees from the University of Wisconsin in human biology, Latin American studies, and public health. She has previously worked at the Wisconsin State Journal, Tucson Weekly and Sulphur Springs News-Telegram. As a sixth generation Hopkins County resident, she loves celebrating our heritage and history.